Main Logbooks page LST commissioning Shift checklists Safe state checklists Maintenance activities LST2-4 Commissioning Old logbooks
GENERAL CAMERA DRIVE ENERGY AMC
  LST1 Drive ELOG, Page 3 of 3  ELOG logo
Entry  Tue Apr 16 10:10:55 2019, Drive Team- Ino&Thierry, PLC Software and Configuration, , Elevation setup,  
Entry  Thu Apr 18 21:21:25 2019, Drive Team- Ino&Thierry&Alessandro, Telescope Operations, Hardware, Elevation limit switch issue,  ElevationEndSwicth.png
Entry  Fri Jan 25 14:12:28 2019, Drive Team, Telescope Operations, General, Drive Movement : PArkin and Parkout,  
Entry  Wed Mar 6 10:54:33 2019, Drive Team- Ino&Thierry&Armand, Telescope Operations, General, DRIVE : High Speed tests,  
Entry  Tue Jul 2 21:25:07 2019, Dirk Hoffmann, Applications, Software, Current & Power Monitoring stuck ("Socomec display"),  
Entry  Sat Jul 6 22:47:38 2019, Dirk Hoffmann, Telescope Operations, General, Car flash from road above+,  
Entry  Tue Apr 16 14:34:22 2019, Drive Team- Ino, Telescope Operations, Hardware, Cabling the azimuth end switches,  
Entry  Sun Nov 24 19:33:56 2019, Mathieu David Armand, Telescope Operations, General, CDM images for bending model,  
Entry  Mon Nov 25 22:53:22 2019, Mathieu David Armand, Telescope Operations, , CDM images 19/11/25,  
Entry  Tue Nov 26 21:37:03 2019, David Sanchez, Armand Fiasson, Mathieu De Bony, Telescope Operations, , CDM bending model image 26-11-2019,  
Entry  Wed Nov 27 21:27:29 2019, Mathieu David Armand, Telescope Operations, , CDM & SG images with alternative target,  
Entry  Fri Jan 25 12:39:52 2019, Drive Team, Problem Fixed, Hardware, Brakes issues fixed,  
Entry  Wed Jan 23 11:26:29 2019, Drive Team, PLC Software and Configuration, General, Azimuth tuning ,  description_drive_pointe.pdf
Entry  Mon Feb 10 14:57:56 2020, Ino + Gael + Thierry, Other, Hardware, Azimuth Locking System , Fixed 14x
Entry  Wed Mar 6 14:58:51 2019, Drive Team- Ino&Thierry&Armand, Telescope Operations, General, Access tower failure,  
Entry  Sat Dec 7 19:16:01 2019, Daniel Mazin, Koji Noda, Hardware, Hardware, ALS East: problem and preliminary solution,  6x
Entry  Wed Jan 23 15:10:34 2019, Drive Team, Telescope Operations, Hardware, ,  
Entry  Thu Jan 24 10:52:59 2019, Drive Team, Hardware, Issues, ,  
Entry  Thu Jun 27 12:04:43 2019, Ino, Problem Fixed, General, ,  
Entry  Thu Sep 12 16:41:53 2019, Drive Team- Ino&Thierry, PLC + Control Software debugging, , ,  
ELOG V3.1.5-fc6679b