Difference between revisions of "Commissioning Shift P1"

From my_wiki
Jump to: navigation, search
m (Daily List of Tests and Installations)
m
Line 25: Line 25:
 
|-
 
|-
  
| 2019-01-21 || style="background: #ffcccb;" | Other || Day off || No activities on site. ||
+
| 2019-01-21 || style="background: #add8e6;" | Drive || || ||  
 
|-
 
|-
| Monday || style="background: #ade6bb;" | Camera || ||  ||  
+
| Monday || style="background: #ade6bb;" | Camera || Some tests with FSM state ||  ||  
 
|-
 
|-
 
|  || style="background: #e6e6ad;" | AUX ||  ||  ||  
 
|  || style="background: #e6e6ad;" | AUX ||  ||  ||  
Line 37: Line 37:
 
|-
 
|-
  
| 2019-01-22 || style="background: #add8e6;" | Drive ||  ||  ||  
+
| 2019-01-22 || style="background: #add8e6;" | Drive || Tests mission "Park In/Park" Out with all software chain. (Bug in December). Tests mission "Park In/Park Out" with cancel and restart at various intermediate position. Measurement of the elevation motor torque vs clamping vs arch cable tension
 +
  ||  ||  
 
|-
 
|-
 
| Tuesday || style="background: #ade6bb;" | Camera ||  ||  ||  
 
| Tuesday || style="background: #ade6bb;" | Camera ||  ||  ||  
Line 43: Line 44:
 
|  || style="background: #e6e6ad;" | AUX ||  ||  ||  
 
|  || style="background: #e6e6ad;" | AUX ||  ||  ||  
 
|-  
 
|-  
|  || style="background: #ffcccb;" | Other ||  || ||
+
|  || style="background: #ffcccb;" | Other ||  || Road condition critical ||
  
 
|-
 
|-

Revision as of 14:50, 29 January 2019

  • Commissioning Shift Period: 1
  • Dates: 19.1.2019 - 4.2.2019
  • Commissioning Shift Leader: Riccardo Rando
  • Commissioning Shifters:
    • Drive: Armand, Inocencio, Thierry (22/01-25/01), Alessandro (27/01-)
    • Camera: Elena (-), Mitsunari (21/01-), Taka (27/01-)
    • Aux: Koji (28/01-)

Back to Commissioning Logbooks.

Commissioning Leader Diary

Commissioning_Leader_Diary_P1

Daily List of Tests and Installations

Date Category / System Action Comments Documents / Pictures
2019-01-20 Other Check of conditions at site P1 CL R. Rando arrived on site, no overlap with previous CL (since there was none).
2019-01-21 Drive
Monday Camera Some tests with FSM state
AUX
Other
2019-01-22 Drive Tests mission "Park In/Park" Out with all software chain. (Bug in December). Tests mission "Park In/Park Out" with cancel and restart at various intermediate position. Measurement of the elevation motor torque vs clamping vs arch cable tension
Tuesday Camera
AUX
Other Road condition critical
2019-01-23 Drive
Wednesday Camera
AUX
Other
2019-01-24 Drive
Thursday Camera
AUX
Other
2019-01-25 Drive
Friday Camera
AUX
Other
2019-01-26 Drive
Saturday Camera
AUX
Other
2019-01-27 Drive
Sunday Camera
AUX
Other