Difference between revisions of "Commissioning Shift Information"
(→Useful links) |
(→Useful links) |
||
Line 11: | Line 11: | ||
= Useful links = | = Useful links = | ||
* [http://www.lst1.iac.es:8090/ elog] | * [http://www.lst1.iac.es:8090/ elog] | ||
− | * [http://lst1.iac.es/safety.html | + | * [http://lst1.iac.es/safety.html Safety documents] |
* [https://portal.cta-observatory.org/WG/lst/Engineering%20Documents/Forms/AllItems.aspx?RootFolder=/WG/lst/Engineering%20Documents/OD%20-%20Operation%20Documents&FolderCTID=0x0120007F7219EA17B572439804AD0D38AE0CD8&View={56D51E03-3CC3-48C3-9B35-E0C904E17FA8} Operation and Mainteinance Manuals] | * [https://portal.cta-observatory.org/WG/lst/Engineering%20Documents/Forms/AllItems.aspx?RootFolder=/WG/lst/Engineering%20Documents/OD%20-%20Operation%20Documents&FolderCTID=0x0120007F7219EA17B572439804AD0D38AE0CD8&View={56D51E03-3CC3-48C3-9B35-E0C904E17FA8} Operation and Mainteinance Manuals] | ||
* [https://ctaoobservatory.sharepoint.com/:b:/s/ctan-onsite-it/Ec00wDApkVlBuI2cO4PVyCUBoxFX2AqtFYDVGGKw7_ys0A?e=eNghvu Log-in procedure to cp01/cp02 machines] | * [https://ctaoobservatory.sharepoint.com/:b:/s/ctan-onsite-it/Ec00wDApkVlBuI2cO4PVyCUBoxFX2AqtFYDVGGKw7_ys0A?e=eNghvu Log-in procedure to cp01/cp02 machines] |
Revision as of 16:22, 11 March 2019
Instructions and useful links for the LST Commissioning Leaders.
LST1 Commissioning Leaders
Overall Commissioning Plans 2019
- CW 12: Camera tests, mainly calibration. No optics tests planned, no drive tests planned. MPI team will come to make improvements in the mechanics
- CW 13: LAPP team is back, drive tests. Dirk and Julien: DAQ tests. Still unclear if the mirrors will be uncovered or not, depends how the next week goes.
Toni Dettlaff will do some optics work inside the dish, also some work in the commissioning container