Difference between revisions of "Commissioning Shift Information"
(→Overall Commissioning Plans 2019) |
(→Overall Commissioning Plans 2019) |
||
Line 24: | Line 24: | ||
= Overall Commissioning Plans 2019 = | = Overall Commissioning Plans 2019 = | ||
− | WEEK 12: 18. | + | WEEK 12: 18.03.2019 - 24.03.2019 |
− | * Camera tests, mainly calibration | + | * Camera tests, mainly calibration |
+ | * EVB commissioning (Dirk, Julien) | ||
* No optics tests planned, no drive tests planned. | * No optics tests planned, no drive tests planned. | ||
* MPI team will come to make improvements in the mechanics | * MPI team will come to make improvements in the mechanics | ||
− | WEEK 13: 26. | + | WEEK 13: 26.03.2019 - 30.03.2019 |
* <b> Still unclear if the mirrors will be uncovered or not </b> | * <b> Still unclear if the mirrors will be uncovered or not </b> | ||
* LAPP team is back, drive tests (Thierry, Ino) | * LAPP team is back, drive tests (Thierry, Ino) | ||
Line 35: | Line 36: | ||
* Toni Dettlaff will do some optics work inside the dish, also some work in the commissioning container | * Toni Dettlaff will do some optics work inside the dish, also some work in the commissioning container | ||
* Mounting of the dish ladders (Christopher Jablonski, Uwe) | * Mounting of the dish ladders (Christopher Jablonski, Uwe) | ||
+ | |||
+ | WEEK 14: 01.04.2019-07.04.2019 | ||
+ | * SIS hardware access, Camera at Park position (Carlos, Miguel) | ||
= Useful links = | = Useful links = |
Revision as of 10:22, 12 March 2019
Instructions and useful links for the LST Commissioning Leaders.
Contents
Emergency phone numbers
Public Emergency | (0) 112 |
Residencia Reception (day time) | (0) +34 922 405 500 (ORM internal: 2500) |
Residencia Night Porter (night time) | (0) +34 609 554 576 |
Commissioning Leader | (0) +34 676 649 025 |
Telescope Manager: Patricia Márquez | (0) +34 620 413 156 |
MAGIC Control Room | +34 922 405 678, +34 922 405 679 (ORM internal: 2-678, 2-679) |
Overall Commissioning Plans 2019
WEEK 12: 18.03.2019 - 24.03.2019
- Camera tests, mainly calibration
- EVB commissioning (Dirk, Julien)
- No optics tests planned, no drive tests planned.
- MPI team will come to make improvements in the mechanics
WEEK 13: 26.03.2019 - 30.03.2019
- Still unclear if the mirrors will be uncovered or not
- LAPP team is back, drive tests (Thierry, Ino)
- DAQ tests (Dirk, Julien)
- Toni Dettlaff will do some optics work inside the dish, also some work in the commissioning container
- Mounting of the dish ladders (Christopher Jablonski, Uwe)
WEEK 14: 01.04.2019-07.04.2019
- SIS hardware access, Camera at Park position (Carlos, Miguel)
Useful links
- Shifters 2019
- elog
- Safety documents
- Operation and Mainteinance Manuals
- Log-in procedure to cp01/cp02 machines
Sub-system Contacts
Camera | Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es) |
Drive / Telescope Control | Julia Mundet (jmundet@ifae.es), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr) |
Optics | Koji Noda (knoda@mppmu.mpg.de) |
Auxiliary Systems | Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr) |
IT | Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp) |