Difference between revisions of "Commissioning Shift Information"

From my_wiki
Jump to: navigation, search
(Overall Commissioning Plans 2019)
(Overall Commissioning Plans 2019)
Line 24: Line 24:
 
= Overall Commissioning Plans 2019 =
 
= Overall Commissioning Plans 2019 =
  
The overall commissioning plan can be found [https://docs.google.com/spreadsheets/d/19Iw7Y3T56AhzhMG7B_foj61pFzf-Ecf9p-YTB4ManMI/edit#gid=0 LST Commissioning Schedule]
+
The overall commissioning plan can be found in: [https://docs.google.com/spreadsheets/d/19Iw7Y3T56AhzhMG7B_foj61pFzf-Ecf9p-YTB4ManMI/edit#gid=0 LST Commissioning Schedule]
  
 
= Useful links =
 
= Useful links =

Revision as of 13:26, 13 March 2019

Instructions and useful links for the LST Commissioning Leaders.

Emergency phone numbers

Public Emergency (0) 112
Residencia Reception (day time) (0) +34 922 405 500 (ORM internal: 2500)
Residencia Night Porter (night time) (0) +34 609 554 576
Commissioning Leader (0) +34 676 649 025
Telescope Manager: Patricia Márquez (0) +34 620 413 156
MAGIC Control Room +34 922 405 678, +34 922 405 679 (ORM internal: 2-678, 2-679)

Overall Commissioning Plans 2019

The overall commissioning plan can be found in: LST Commissioning Schedule

Useful links

Sub-system Contacts

Camera Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es)
Drive / Telescope Control Julia Mundet (jmundet@ifae.es), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr)
Optics Koji Noda (knoda@mppmu.mpg.de)
Auxiliary Systems Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr)
IT Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp)

Tasks

Check-lists