Difference between revisions of "Commissioning Shift Information"
MartinWill (talk | contribs) m (MartinWill moved page Commissioning Leader to Commissioning Shift Information) |
MartinWill (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Instructions and useful links for the LST Commissioning Leaders. | + | Instructions and useful links for the LST Commissioning Leaders and Commissioning Shifters. |
= Emergency phone numbers = | = Emergency phone numbers = | ||
+ | |||
+ | To dial any external number from the Commissioning Container you need to dial (0) first. From a cell phone do not dial the (0). | ||
+ | |||
{| class="wikitable" | {| class="wikitable" | ||
|Public Emergency | |Public Emergency | ||
Line 12: | Line 15: | ||
| (0) +34 609 554 576 | | (0) +34 609 554 576 | ||
|- | |- | ||
− | | Commissioning Leader | + | | LST Commissioning Leader |
| (0) +34 676 649 025 | | (0) +34 676 649 025 | ||
|- | |- | ||
− | | Telescope Manager: Patricia Márquez | + | | LST Telescope Manager: Patricia Márquez |
| (0) +34 620 413 156 | | (0) +34 620 413 156 | ||
|- | |- | ||
Line 24: | Line 27: | ||
| (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2678, 2679) | | (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2678, 2679) | ||
|- | |- | ||
− | | | + | | MAGIC Shift Leader |
| (0) +34 629 160 816 | | (0) +34 629 160 816 | ||
|- | |- | ||
Line 30: | Line 33: | ||
= Alarms = | = Alarms = | ||
− | |||
− | = Commissioning Plans 2019 = | + | Alarms are sent to lst1.c.leader@gmail.com which is installed on the shift leader phone. |
+ | |||
+ | = Commissioning Plans and Shift Schedule 2019 = | ||
− | The overall commissioning plan can be found in | + | The overall commissioning plan can be found in the first sheet of the [https://docs.google.com/spreadsheets/d/19Iw7Y3T56AhzhMG7B_foj61pFzf-Ecf9p-YTB4ManMI LST Commissioning Schedule], the shift plan on the second sheet. |
= Tasks = | = Tasks = | ||
+ | |||
* Report in the EB meeting, Tuesdays 09:30 CET | * Report in the EB meeting, Tuesdays 09:30 CET | ||
* Coordinate activities on-site | * Coordinate activities on-site |
Revision as of 15:01, 27 May 2019
Instructions and useful links for the LST Commissioning Leaders and Commissioning Shifters.
Contents
- 1 Emergency phone numbers
- 2 Alarms
- 3 Commissioning Plans and Shift Schedule 2019
- 4 Tasks
- 5 Check-lists
- 6 Monitoring
- 7 Documentation
- 8 Data-taking procedures
- 9 Safety settings
- 10 Commissioning responsible
- 11 Sub-system contacts
- 12 Screen layout of the commissioning container
- 13 Onsite computing
- 14 Installation instructions
Emergency phone numbers
To dial any external number from the Commissioning Container you need to dial (0) first. From a cell phone do not dial the (0).
Public Emergency | (0) 112 |
Residencia Reception (day time) | (0) +34 922 405 500 (ORM internal: 2500) |
Residencia Night Porter (night time) | (0) +34 609 554 576 |
LST Commissioning Leader | (0) +34 676 649 025 |
LST Telescope Manager: Patricia Márquez | (0) +34 620 413 156 |
LST Commissioning Container | (0) +34 922 405 556 (ORM internal: 2556) |
MAGIC Control Room | (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2678, 2679) |
MAGIC Shift Leader | (0) +34 629 160 816 |
Alarms
Alarms are sent to lst1.c.leader@gmail.com which is installed on the shift leader phone.
Commissioning Plans and Shift Schedule 2019
The overall commissioning plan can be found in the first sheet of the LST Commissioning Schedule, the shift plan on the second sheet.
Tasks
- Report in the EB meeting, Tuesdays 09:30 CET
- Coordinate activities on-site
- Check for the overall safety in the telescope area
- Make sure the camera check-lists are followed when operating the camera
- Check the incidents page and make sure it is kept up to date
- Report incidents to the commissioning whatsapp group
- Report plans & important issues in the general elog: GENERAL
Check-lists
Monitoring
Publicly available monitoring:
- MAGIC Weather
- Camera: Temperature/Pressure
- Camera: modules
- Camera: pixels
Local monitoring running on mon-right monitors of the commissioning container:
- Drive: startDriveMonitoring.sh script
- Flywheel: https://10.1.200.1/webvisu/webvisu.htm
- IT: https://10.1.200.5/webvisu/webvisu.htm
- Event display: Instructions on Event Display
Documentation
- LST1 Commissioning Operation Manual (overleaf)
- Shifters 2019
- Incidents 2019
- elog
- Safety documents
- Operation and Maintenance Manuals
- CTA-North slack channel
- LST Shipments
Data-taking procedures
Safety settings
Item |
Threshold |
Action if not fulfilled |
Humidity inside the camera | < 90% | Move camera to Safe |
Temperature inside the camera | < 26 deg | Move camera to Safe |
Camera fans speed | 2000-3000 | Move camera to Safe |
Alarms in OPCUA | All green | Move camera to Safe |
Rain | Park telescope. After close camera shutter | |
Wind speed | < 50 km/h | Park telescope. After close camera shutter |
Wind gusts | < 60 km/h | Park telescope. After close camera shutter |
Commissioning responsible
Coordinator | Daniel Mazin (mazin@icrr.u-tokyo.ac.jp) |
Deputy Coordinator | Thomas Schweizer (tschweiz@mppmu.mpg.de) |
Sub-system contacts
Camera | Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es) |
Drive | Inocencio Monteiro (monteiro@lapp.in2p3.fr), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr) |
Optics | Koji Noda (knoda@icrr.u-tokyo.ac.jp) |
Auxiliary Systems | Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr) |
Energy Storage | Koji Noda (knoda@icrr.u-tokyo.ac.jp), Daniel Mazin (mazin@icrr.u-tokyo.ac.jp) |
onsite IT centre | Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp), Rafael - Fujitsu (rafael@jp.fujitsu.com), IT admins (admin-ctan@cta-observatory.org) |
Screen layout of the commissioning container
Onsite computing
- Log-in procedure to cp01/cp02 machines
- Network organization: IP ranges
- CTA North Array Control System (IP, Switch port, Server port, cables)
- Slides from Jordi on the IT cluster, Nov. 2018