Difference between revisions of "Incidents 2021"
(Created page with "{| class="wikitable" border=1 cellpadding="5" cellspacing="0" |- style="background:#efefef;" ! style="width: 100px;" | Date !! style="width: 210px;" | What happened? !! style...") |
MartinWill (talk | contribs) |
||
(One intermediate revision by one other user not shown) | |||
Line 4: | Line 4: | ||
|- valign="top" | |- valign="top" | ||
− | | | + | | 2021-01-19 || Consequences of snow storm in the ORM (January 2021): 1. Cover of motors of ALSs are damaged; 2. Handrail of camera access tower is damaged; 3. A network cabinet is damaged; 4. A cable of ALS-West was removed; 5. Cover of cable trays were removed || Inspection and repair || An inspection has been done by LST team on 18.01.2021. Several tests were done. A final inspection is pending because there are a lot of ice in the site. 1. Pending / 2. Pending / 3. Pending / 4. Repaired / 5. Pending || [[File:IMG_20210118_111533.jpg|120px|thumb|left]] [[File:IMG_20210115_113018.jpg|120px|thumb|right]] [[File:IMG_20210118_112318.jpg|120px|thumb|left]] || NO |
Latest revision as of 10:13, 22 January 2021
Date | What happened? | Corrective measures | Comments | Documents | Incident Closed? |
---|---|---|---|---|---|
2021-01-19 | Consequences of snow storm in the ORM (January 2021): 1. Cover of motors of ALSs are damaged; 2. Handrail of camera access tower is damaged; 3. A network cabinet is damaged; 4. A cable of ALS-West was removed; 5. Cover of cable trays were removed | Inspection and repair | An inspection has been done by LST team on 18.01.2021. Several tests were done. A final inspection is pending because there are a lot of ice in the site. 1. Pending / 2. Pending / 3. Pending / 4. Repaired / 5. Pending | NO |