Incidents 2021
Date | What happened? | Corrective measures | Comments | Documents | Incident Closed? |
---|---|---|---|---|---|
2021-01-19 | Consequences of snow storm in the ORM (January 2021): 1. Cover of motors of ALSs are damaged; 2. Handrail of camera access tower is damaged; 3. A network cabinet is damaged; 4. A cable of ALS-West was removed; 5. Cover of cable trays were removed | Inspection and repair | An inspection has been done by LST team on 18.01.2021. Several tests were done. A final inspection is pending because there are a lot of ice in the site. 1. Pending / 2. Pending / 3. Pending / 4. Repaired / 5. Pending | NO |