Difference between revisions of "Commissioning Shift Information"
(→Emergency phone numbers) |
(→Useful links) |
||
Line 44: | Line 44: | ||
* [https://www.overleaf.com/4571234755dchgwppvxmxn LST1 Commissioning Operation Manual (overleaf)] | * [https://www.overleaf.com/4571234755dchgwppvxmxn LST1 Commissioning Operation Manual (overleaf)] | ||
* [https://docs.google.com/spreadsheets/d/1wi4CGx1Tmhloic1J_4FWs8m_PeB4wtHT6cpxU-ngVjI/edit#gid=0 Shifters 2019] | * [https://docs.google.com/spreadsheets/d/1wi4CGx1Tmhloic1J_4FWs8m_PeB4wtHT6cpxU-ngVjI/edit#gid=0 Shifters 2019] | ||
− | * [http://www.lst1.iac.es | + | * [http://www.lst1.iac.es/elog elog] |
* [http://lst1.iac.es/safety.html Safety documents] | * [http://lst1.iac.es/safety.html Safety documents] | ||
* [https://portal.cta-observatory.org/WG/lst/Engineering%20Documents/Forms/AllItems.aspx?RootFolder=/WG/lst/Engineering%20Documents/OD%20-%20Operation%20Documents&FolderCTID=0x0120007F7219EA17B572439804AD0D38AE0CD8&View={56D51E03-3CC3-48C3-9B35-E0C904E17FA8} Operation and Maintenance Manuals] | * [https://portal.cta-observatory.org/WG/lst/Engineering%20Documents/Forms/AllItems.aspx?RootFolder=/WG/lst/Engineering%20Documents/OD%20-%20Operation%20Documents&FolderCTID=0x0120007F7219EA17B572439804AD0D38AE0CD8&View={56D51E03-3CC3-48C3-9B35-E0C904E17FA8} Operation and Maintenance Manuals] |
Revision as of 21:39, 18 March 2019
Instructions and useful links for the LST Commissioning Leaders.
Contents
Emergency phone numbers
Public Emergency | (0) 112 |
Residencia Reception (day time) | (0) +34 922 405 500 (ORM internal: 2500) |
Residencia Night Porter (night time) | (0) +34 609 554 576 |
Commissioning Leader | (0) +34 676 649 025 |
Telescope Manager: Patricia Márquez | (0) +34 620 413 156 |
LST Commissioning Container | (0) +34 922 405 556 (ORM internal: 2556) |
MAGIC Control Room | (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2-678, 2-679) |
Alarms
Alarms are sent to lst1.c.leader@gmail.com which is on the shift leader phone.
Overall Commissioning Plans 2019
The overall commissioning plan can be found in: LST Commissioning Schedule
Check-lists
Monitoring
- Weather
- Camera monitoring: Temperature/Pressure
- Camera monitoring: modules
- Camera monitoring: pixels
Useful links
- LST1 Commissioning Operation Manual (overleaf)
- Shifters 2019
- elog
- Safety documents
- Operation and Maintenance Manuals
- Log-in procedure to cp01/cp02 machines
- List of IP
- Slides from Jordi on the IT cluster, Nov. 2018
- GPS installation instructions
- NVIDIA PCI card installation
Sub-system Contacts
Camera | Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es) |
Drive / Telescope Control | Julia Mundet (jmundet@ifae.es), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr) |
Optics | Koji Noda (knoda@mppmu.mpg.de) |
Auxiliary Systems | Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr) |
IT | Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp, Rafael - Fujitsu (rafael@jp.fujitsu.com, IT admins (admin-ctan@cta-observatory.org) |
Useful Info
Tasks
- Report in the EB meeting, Tuesdays 09:30 CET
- Coordinate activities on-site
- Check for the overall safety in the telescope area