Difference between revisions of "Commissioning Shift Information"

From my_wiki
Jump to: navigation, search
(Sub-system Contacts)
Line 52: Line 52:
 
* [https://docs.google.com/document/d/1Vw9FJblxme8rYyBE5gS0NVFdd_6zbcdH9g99yGJAsGk/edit GPS installation instructions]
 
* [https://docs.google.com/document/d/1Vw9FJblxme8rYyBE5gS0NVFdd_6zbcdH9g99yGJAsGk/edit GPS installation instructions]
 
* [http://www.lst1.iac.es/wiki/index.php/NVIDIA_card_installation NVIDIA PCI card installation]
 
* [http://www.lst1.iac.es/wiki/index.php/NVIDIA_card_installation NVIDIA PCI card installation]
 +
 +
 +
= Commissioning responsible =
 +
{| class="wikitable"
 +
| Coordinator
 +
| Daniel Mazin ([mailto:mazin@icrr.u-tokyo.ac.jp mazin@icrr.u-tokyo.ac.jp])
 +
|-
 +
| Deputy Coordinator
 +
| Thomas Schweizer ([mailto:tschweiz@mppmu.mpg.de  tschweiz@mppmu.mpg.de])
 +
|-
 +
|}
 +
  
 
= Sub-system Contacts =
 
= Sub-system Contacts =
Line 58: Line 70:
 
| Carlos Delgado ([mailto:carlos.delgado@ciemat.es carlos.delgado@ciemat.es]), Oscar Blanch ([mailto:blanch@ifae.es blanch@ifae.es])
 
| Carlos Delgado ([mailto:carlos.delgado@ciemat.es carlos.delgado@ciemat.es]), Oscar Blanch ([mailto:blanch@ifae.es blanch@ifae.es])
 
|-
 
|-
| Drive / Telescope Control
+
| Drive
| Julia Mundet ([mailto:jmundet@ifae.es jmundet@ifae.es]), Thierry Le Flour ([mailto:thierry.le-flour@lapp.in2p3.fr thierry.le-flour@lapp.in2p3.fr])
+
| Inocencio Monteiro ([mailto:monteiro@lapp.in2p3.fr monteiro@lapp.in2p3.fr]), Thierry Le Flour ([mailto:thierry.le-flour@lapp.in2p3.fr thierry.le-flour@lapp.in2p3.fr])
 
|-
 
|-
 
| Optics
 
| Optics
Line 67: Line 79:
 
| Armand Fiasson ([mailto:armand.fiasson@lapp.in2p3.fr armand.fiasson@lapp.in2p3.fr]), Eric Chabanne ([mailto:eric.chabanne@lapp.in2p3.fr eric.chabanne@lapp.in2p3.fr])
 
| Armand Fiasson ([mailto:armand.fiasson@lapp.in2p3.fr armand.fiasson@lapp.in2p3.fr]), Eric Chabanne ([mailto:eric.chabanne@lapp.in2p3.fr eric.chabanne@lapp.in2p3.fr])
 
|-
 
|-
| IT
+
| onsite IT centre
 
| Daniela Hadasch ([mailto:hadasch@icrr.u-tokyo.ac.jp hadasch@icrr.u-tokyo.ac.jp], Rafael - Fujitsu ([mailto:rafael@jp.fujitsu.com rafael@jp.fujitsu.com], IT admins ([mailto:admin-ctan@cta-observatory.org admin-ctan@cta-observatory.org])  
 
| Daniela Hadasch ([mailto:hadasch@icrr.u-tokyo.ac.jp hadasch@icrr.u-tokyo.ac.jp], Rafael - Fujitsu ([mailto:rafael@jp.fujitsu.com rafael@jp.fujitsu.com], IT admins ([mailto:admin-ctan@cta-observatory.org admin-ctan@cta-observatory.org])  
 
|-
 
|-

Revision as of 06:22, 20 March 2019

Instructions and useful links for the LST Commissioning Leaders.

Emergency phone numbers

Public Emergency (0) 112
Residencia Reception (day time) (0) +34 922 405 500 (ORM internal: 2500)
Residencia Night Porter (night time) (0) +34 609 554 576
Commissioning Leader (0) +34 676 649 025
Telescope Manager: Patricia Márquez (0) +34 620 413 156
LST Commissioning Container (0) +34 922 405 556 (ORM internal: 2556)
MAGIC Control Room (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2-678, 2-679)

Alarms

Alarms are sent to lst1.c.leader@gmail.com which is on the shift leader phone.

Overall Commissioning Plans 2019

The overall commissioning plan can be found in: LST Commissioning Schedule

Check-lists

Monitoring

Useful links


Commissioning responsible

Coordinator Daniel Mazin (mazin@icrr.u-tokyo.ac.jp)
Deputy Coordinator Thomas Schweizer (tschweiz@mppmu.mpg.de)


Sub-system Contacts

Camera Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es)
Drive Inocencio Monteiro (monteiro@lapp.in2p3.fr), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr)
Optics Koji Noda (knoda@icrr.u-tokyo.ac.jp)
Auxiliary Systems Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr)
onsite IT centre Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp, Rafael - Fujitsu (rafael@jp.fujitsu.com, IT admins (admin-ctan@cta-observatory.org)

Useful Info

Screens in Commissioning Container & Onsite IT
ScreenArrangement-v3 test.png Onsite-IT.png

Tasks

  • Report in the EB meeting, Tuesdays 09:30 CET
  • Coordinate activities on-site
  • Check for the overall safety in the telescope area