Difference between revisions of "Commissioning Shift Information"
Line 31: | Line 31: | ||
The overall commissioning plan can be found in: [https://docs.google.com/spreadsheets/d/19Iw7Y3T56AhzhMG7B_foj61pFzf-Ecf9p-YTB4ManMI/edit#gid=0 LST Commissioning Schedule] | The overall commissioning plan can be found in: [https://docs.google.com/spreadsheets/d/19Iw7Y3T56AhzhMG7B_foj61pFzf-Ecf9p-YTB4ManMI/edit#gid=0 LST Commissioning Schedule] | ||
+ | |||
+ | = Tasks = | ||
+ | * Report in the EB meeting, Tuesdays 09:30 CET | ||
+ | * Coordinate activities on-site | ||
+ | * Check for the overall safety in the telescope area | ||
= Check-lists = | = Check-lists = | ||
* [https://docs.google.com/forms/d/1TbEijz3uhTyQJTGK7m3GCKNs2kXykWMArb3KN7irFqE/viewform?edit_requested=true Camera Startup] | * [https://docs.google.com/forms/d/1TbEijz3uhTyQJTGK7m3GCKNs2kXykWMArb3KN7irFqE/viewform?edit_requested=true Camera Startup] | ||
* [https://docs.google.com/forms/d/1ZcsP5rCBJWYjUZg0TRU9YPVVjEaaPaLWc45uVJEnWYU/viewform?edit_requested=true Camera Shutdown] | * [https://docs.google.com/forms/d/1ZcsP5rCBJWYjUZg0TRU9YPVVjEaaPaLWc45uVJEnWYU/viewform?edit_requested=true Camera Shutdown] | ||
+ | |||
= Monitoring = | = Monitoring = | ||
* [http://www.magic.iac.es/site/weather/index.html Weather] | * [http://www.magic.iac.es/site/weather/index.html Weather] | ||
Line 97: | Line 103: | ||
|} | |} | ||
− | |||
− | |||
− | |||
− | |||
= Installation documentation = | = Installation documentation = |
Revision as of 08:54, 27 March 2019
Instructions and useful links for the LST Commissioning Leaders.
Contents
Emergency phone numbers
Public Emergency | (0) 112 |
Residencia Reception (day time) | (0) +34 922 405 500 (ORM internal: 2500) |
Residencia Night Porter (night time) | (0) +34 609 554 576 |
Commissioning Leader | (0) +34 676 649 025 |
Telescope Manager: Patricia Márquez | (0) +34 620 413 156 |
LST Commissioning Container | (0) +34 922 405 556 (ORM internal: 2556) |
MAGIC Control Room | (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2678, 2679) |
Alarms
Alarms are sent to lst1.c.leader@gmail.com which is installed on the shift leader phone
Commissioning Plans 2019
The overall commissioning plan can be found in: LST Commissioning Schedule
Tasks
- Report in the EB meeting, Tuesdays 09:30 CET
- Coordinate activities on-site
- Check for the overall safety in the telescope area
Check-lists
Monitoring
- Weather
- Camera monitoring: Temperature/Pressure
- Camera monitoring: modules
- Camera monitoring: pixels
Useful links
- LST1 Commissioning Operation Manual (overleaf)
- Shifters 2019
- elog
- Safety documents
- Operation and Maintenance Manuals
- Log-in procedure to cp01/cp02 machines
- Network organization: IP ranges
- CTA North Array Control System (IP, Switch port, Server port, cables)
- Slides from Jordi on the IT cluster, Nov. 2018
- LST Shipments
Commissioning responsible
Coordinator | Daniel Mazin (mazin@icrr.u-tokyo.ac.jp) |
Deputy Coordinator | Thomas Schweizer (tschweiz@mppmu.mpg.de) |
Sub-system Contacts
Camera | Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es) |
Drive | Inocencio Monteiro (monteiro@lapp.in2p3.fr), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr) |
Optics | Koji Noda (knoda@icrr.u-tokyo.ac.jp) |
Auxiliary Systems | Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr) |
Energy Storage | Koji Noda (knoda@icrr.u-tokyo.ac.jp), Daniel Mazin (mazin@icrr.u-tokyo.ac.jp) |
onsite IT centre | Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp), Rafael - Fujitsu (rafael@jp.fujitsu.com), IT admins (admin-ctan@cta-observatory.org) |
Useful Info