Difference between revisions of "Commissioning Shift Information"

From my_wiki
Jump to: navigation, search
(Tasks)
(Documentation)
Line 59: Line 59:
 
* [http://lst1.iac.es/safety.html Safety documents]
 
* [http://lst1.iac.es/safety.html Safety documents]
 
* [https://portal.cta-observatory.org/WG/lst/Engineering%20Documents/Forms/AllItems.aspx?RootFolder=/WG/lst/Engineering%20Documents/OD%20-%20Operation%20Documents&FolderCTID=0x0120007F7219EA17B572439804AD0D38AE0CD8&View={56D51E03-3CC3-48C3-9B35-E0C904E17FA8} Operation and Maintenance Manuals]
 
* [https://portal.cta-observatory.org/WG/lst/Engineering%20Documents/Forms/AllItems.aspx?RootFolder=/WG/lst/Engineering%20Documents/OD%20-%20Operation%20Documents&FolderCTID=0x0120007F7219EA17B572439804AD0D38AE0CD8&View={56D51E03-3CC3-48C3-9B35-E0C904E17FA8} Operation and Maintenance Manuals]
 +
* [https://cta-north.slack.com CTA-North slack channel]
 
* [https://ctaoobservatory.sharepoint.com/:b:/s/ctan-onsite-it/Ec00wDApkVlBuI2cO4PVyCUBoxFX2AqtFYDVGGKw7_ys0A?e=eNghvu Log-in procedure to cp01/cp02 machines]
 
* [https://ctaoobservatory.sharepoint.com/:b:/s/ctan-onsite-it/Ec00wDApkVlBuI2cO4PVyCUBoxFX2AqtFYDVGGKw7_ys0A?e=eNghvu Log-in procedure to cp01/cp02 machines]
 
* [https://docs.google.com/spreadsheets/d/16FzSagSH0YlhC03u8K3C20uvV3Rxcpo3e8fHASWkAQs/edit#gid=0 Network organization: IP ranges]
 
* [https://docs.google.com/spreadsheets/d/16FzSagSH0YlhC03u8K3C20uvV3Rxcpo3e8fHASWkAQs/edit#gid=0 Network organization: IP ranges]

Revision as of 11:03, 27 March 2019

Instructions and useful links for the LST Commissioning Leaders.

Emergency phone numbers

Public Emergency (0) 112
Residencia Reception (day time) (0) +34 922 405 500 (ORM internal: 2500)
Residencia Night Porter (night time) (0) +34 609 554 576
Commissioning Leader (0) +34 676 649 025
Telescope Manager: Patricia Márquez (0) +34 620 413 156
LST Commissioning Container (0) +34 922 405 556 (ORM internal: 2556)
MAGIC Control Room (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2678, 2679)

Alarms

Alarms are sent to lst1.c.leader@gmail.com which is installed on the shift leader phone

Commissioning Plans 2019

The overall commissioning plan can be found in: LST Commissioning Schedule

Tasks

  • Report in the EB meeting, Tuesdays 09:30 CET
  • Coordinate activities on-site
  • Check for the overall safety in the telescope area
  • Make sure the camera check-lists are followed when operating the camera
  • Report incidences to the commissioning whatsapp group
  • Report plans & important issues in the general elog: GENERAL

Check-lists

Monitoring

Documentation

Commissioning responsible

Coordinator Daniel Mazin (mazin@icrr.u-tokyo.ac.jp)
Deputy Coordinator Thomas Schweizer (tschweiz@mppmu.mpg.de)

Sub-system contacts

Camera Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es)
Drive Inocencio Monteiro (monteiro@lapp.in2p3.fr), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr)
Optics Koji Noda (knoda@icrr.u-tokyo.ac.jp)
Auxiliary Systems Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr)
Energy Storage Koji Noda (knoda@icrr.u-tokyo.ac.jp), Daniel Mazin (mazin@icrr.u-tokyo.ac.jp)
onsite IT centre Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp), Rafael - Fujitsu (rafael@jp.fujitsu.com), IT admins (admin-ctan@cta-observatory.org)

Screen layout and Onsite IT

Screens in Commissioning Container & Onsite IT
ScreenArrangement-v3 test.png Onsite-IT.png

Installation documentation