Difference between revisions of "Commissioning Shift Information"
(→Screen layout Commissioning Container) |
(→Documentation) |
||
Line 60: | Line 60: | ||
* [https://portal.cta-observatory.org/WG/lst/Engineering%20Documents/Forms/AllItems.aspx?RootFolder=/WG/lst/Engineering%20Documents/OD%20-%20Operation%20Documents&FolderCTID=0x0120007F7219EA17B572439804AD0D38AE0CD8&View={56D51E03-3CC3-48C3-9B35-E0C904E17FA8} Operation and Maintenance Manuals] | * [https://portal.cta-observatory.org/WG/lst/Engineering%20Documents/Forms/AllItems.aspx?RootFolder=/WG/lst/Engineering%20Documents/OD%20-%20Operation%20Documents&FolderCTID=0x0120007F7219EA17B572439804AD0D38AE0CD8&View={56D51E03-3CC3-48C3-9B35-E0C904E17FA8} Operation and Maintenance Manuals] | ||
* [https://cta-north.slack.com CTA-North slack channel] | * [https://cta-north.slack.com CTA-North slack channel] | ||
− | |||
− | |||
− | |||
− | |||
* [https://docs.google.com/spreadsheets/d/1XQR_n-Il8oztzJ3mErjdx_aycwsRhlmcWVW4L8XcSps/edit?usp=sharing LST Shipments] | * [https://docs.google.com/spreadsheets/d/1XQR_n-Il8oztzJ3mErjdx_aycwsRhlmcWVW4L8XcSps/edit?usp=sharing LST Shipments] | ||
Revision as of 11:28, 27 March 2019
Instructions and useful links for the LST Commissioning Leaders.
Contents
Emergency phone numbers
Public Emergency | (0) 112 |
Residencia Reception (day time) | (0) +34 922 405 500 (ORM internal: 2500) |
Residencia Night Porter (night time) | (0) +34 609 554 576 |
Commissioning Leader | (0) +34 676 649 025 |
Telescope Manager: Patricia Márquez | (0) +34 620 413 156 |
LST Commissioning Container | (0) +34 922 405 556 (ORM internal: 2556) |
MAGIC Control Room | (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2678, 2679) |
Alarms
Alarms are sent to lst1.c.leader@gmail.com which is installed on the shift leader phone
Commissioning Plans 2019
The overall commissioning plan can be found in: LST Commissioning Schedule
Tasks
- Report in the EB meeting, Tuesdays 09:30 CET
- Coordinate activities on-site
- Check for the overall safety in the telescope area
- Make sure the camera check-lists are followed when operating the camera
- Report incidences to the commissioning whatsapp group
- Report plans & important issues in the general elog: GENERAL
Check-lists
Monitoring
- Weather
- Camera: Temperature/Pressure
- Camera: modules
- Camera: pixels
- Drive: startDriveMonitoring.sh script
- Flywheel: https://10.1.200.1/webvisu/webvisu.htm
- IT: https://10.1.200.5/webvisu/webvisu.htm
Documentation
- LST1 Commissioning Operation Manual (overleaf)
- Shifters 2019
- elog
- Safety documents
- Operation and Maintenance Manuals
- CTA-North slack channel
- LST Shipments
Commissioning responsible
Coordinator | Daniel Mazin (mazin@icrr.u-tokyo.ac.jp) |
Deputy Coordinator | Thomas Schweizer (tschweiz@mppmu.mpg.de) |
Sub-system contacts
Camera | Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es) |
Drive | Inocencio Monteiro (monteiro@lapp.in2p3.fr), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr) |
Optics | Koji Noda (knoda@icrr.u-tokyo.ac.jp) |
Auxiliary Systems | Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr) |
Energy Storage | Koji Noda (knoda@icrr.u-tokyo.ac.jp), Daniel Mazin (mazin@icrr.u-tokyo.ac.jp) |
onsite IT centre | Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp), Rafael - Fujitsu (rafael@jp.fujitsu.com), IT admins (admin-ctan@cta-observatory.org) |