Instructions and useful links for the LST Commissioning Leaders.
+
Instructions and useful links for the LST Commissioning Leaders and Commissioning Shifters.
  
 
= Emergency phone numbers =
 
= Emergency phone numbers =
 +
 +
To dial any external number from the Commissioning Container you need to dial (0) first. From a cell phone do not dial the (0).
 +
 
{| class="wikitable"
 
{| class="wikitable"
 
|Public Emergency  
 
|Public Emergency  
Line 12: Line 15:
 
| (0) +34 609 554 576
 
| (0) +34 609 554 576
 
|-
 
|-
| Commissioning Leader  
+
| LST Commissioning Leader  
 
| (0) +34 676 649 025  
 
| (0) +34 676 649 025  
 
|-
 
|-
| Telescope Manager: Patricia Márquez
+
| LST Telescope Manager: Patricia Márquez
 
| (0) +34 620 413 156  
 
| (0) +34 620 413 156  
 
|-
 
|-
Line 24: Line 27:
 
| (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2678, 2679)  
 
| (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2678, 2679)  
 
|-
 
|-
| MAGIC Shiftleader
+
| MAGIC Shift Leader
 
| (0) +34 629 160 816  
 
| (0) +34 629 160 816  
 
|-
 
|-
Line 30: Line 33:
  
 
= Alarms =
 
= Alarms =
Alarms are sent to lst1.c.leader@gmail.com which is installed on the shift leader phone
 
  
= Commissioning Plans 2019 =
+
Alarms are sent to lst1.c.leader@gmail.com which is installed on the shift leader phone.
 +
 
 +
= Commissioning Plans and Shift Schedule 2019 =
  
The overall commissioning plan can be found in: [https://docs.google.com/spreadsheets/d/19Iw7Y3T56AhzhMG7B_foj61pFzf-Ecf9p-YTB4ManMI/edit#gid=0 LST Commissioning Schedule]
+
The overall commissioning plan can be found in the first sheet of the [https://docs.google.com/spreadsheets/d/19Iw7Y3T56AhzhMG7B_foj61pFzf-Ecf9p-YTB4ManMI LST Commissioning Schedule], the shift plan on the second sheet.
  
 
= Tasks =
 
= Tasks =
 +
 
* Report in the EB meeting, Tuesdays 09:30 CET
 
* Report in the EB meeting, Tuesdays 09:30 CET
 
* Coordinate activities on-site
 
* Coordinate activities on-site

Revision as of 15:01, 27 May 2019

Instructions and useful links for the LST Commissioning Leaders and Commissioning Shifters.

Emergency phone numbers

To dial any external number from the Commissioning Container you need to dial (0) first. From a cell phone do not dial the (0).

Public Emergency (0) 112
Residencia Reception (day time) (0) +34 922 405 500 (ORM internal: 2500)
Residencia Night Porter (night time) (0) +34 609 554 576
LST Commissioning Leader (0) +34 676 649 025
LST Telescope Manager: Patricia Márquez (0) +34 620 413 156
LST Commissioning Container (0) +34 922 405 556 (ORM internal: 2556)
MAGIC Control Room (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2678, 2679)
MAGIC Shift Leader (0) +34 629 160 816

Alarms

Alarms are sent to lst1.c.leader@gmail.com which is installed on the shift leader phone.

Commissioning Plans and Shift Schedule 2019

The overall commissioning plan can be found in the first sheet of the LST Commissioning Schedule, the shift plan on the second sheet.

Tasks

  • Report in the EB meeting, Tuesdays 09:30 CET
  • Coordinate activities on-site
  • Check for the overall safety in the telescope area
  • Make sure the camera check-lists are followed when operating the camera
  • Check the incidents page and make sure it is kept up to date
  • Report incidents to the commissioning whatsapp group
  • Report plans & important issues in the general elog: GENERAL

Check-lists

Monitoring

Publicly available monitoring:

Local monitoring running on mon-right monitors of the commissioning container:

Documentation

Data-taking procedures

Safety settings

Safe operation settings

Item

Threshold

Action if not fulfilled

Humidity inside the camera < 90% Move camera to Safe
Temperature inside the camera < 26 deg Move camera to Safe
Camera fans speed 2000-3000 Move camera to Safe
Alarms in OPCUA All green Move camera to Safe
Rain Park telescope. After close camera shutter
Wind speed < 50 km/h Park telescope. After close camera shutter
Wind gusts < 60 km/h Park telescope. After close camera shutter

Commissioning responsible

Coordinator Daniel Mazin (mazin@icrr.u-tokyo.ac.jp)
Deputy Coordinator Thomas Schweizer (tschweiz@mppmu.mpg.de)

Sub-system contacts

Camera Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es)
Drive Inocencio Monteiro (monteiro@lapp.in2p3.fr), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr)
Optics Koji Noda (knoda@icrr.u-tokyo.ac.jp)
Auxiliary Systems Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr)
Energy Storage Koji Noda (knoda@icrr.u-tokyo.ac.jp), Daniel Mazin (mazin@icrr.u-tokyo.ac.jp)
onsite IT centre Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp), Rafael - Fujitsu (rafael@jp.fujitsu.com), IT admins (admin-ctan@cta-observatory.org)

Phone contact list

Screen layout of the commissioning container

Screens in Commissioning Container
ScreenArrangement-v3 test.png
Layout March 2019
CommContainer Screens Top Left.jpg CommContainer Screens Top Right.jpg

Onsite computing

Onsite IT
Onsite-IT.png

Installation instructions