Difference between revisions of "Commissioning Shift Information"

From my_wiki
Jump to: navigation, search
(Emergency phone numbers)
(Useful links)
Line 44: Line 44:
 
* [https://www.overleaf.com/4571234755dchgwppvxmxn LST1 Commissioning Operation Manual (overleaf)]
 
* [https://www.overleaf.com/4571234755dchgwppvxmxn LST1 Commissioning Operation Manual (overleaf)]
 
* [https://docs.google.com/spreadsheets/d/1wi4CGx1Tmhloic1J_4FWs8m_PeB4wtHT6cpxU-ngVjI/edit#gid=0 Shifters 2019]
 
* [https://docs.google.com/spreadsheets/d/1wi4CGx1Tmhloic1J_4FWs8m_PeB4wtHT6cpxU-ngVjI/edit#gid=0 Shifters 2019]
* [http://www.lst1.iac.es:8090/ elog]
+
* [http://www.lst1.iac.es/elog elog]
 
* [http://lst1.iac.es/safety.html Safety documents]
 
* [http://lst1.iac.es/safety.html Safety documents]
 
* [https://portal.cta-observatory.org/WG/lst/Engineering%20Documents/Forms/AllItems.aspx?RootFolder=/WG/lst/Engineering%20Documents/OD%20-%20Operation%20Documents&FolderCTID=0x0120007F7219EA17B572439804AD0D38AE0CD8&View={56D51E03-3CC3-48C3-9B35-E0C904E17FA8} Operation and Maintenance Manuals]
 
* [https://portal.cta-observatory.org/WG/lst/Engineering%20Documents/Forms/AllItems.aspx?RootFolder=/WG/lst/Engineering%20Documents/OD%20-%20Operation%20Documents&FolderCTID=0x0120007F7219EA17B572439804AD0D38AE0CD8&View={56D51E03-3CC3-48C3-9B35-E0C904E17FA8} Operation and Maintenance Manuals]

Revision as of 21:39, 18 March 2019

Instructions and useful links for the LST Commissioning Leaders.

Emergency phone numbers

Public Emergency (0) 112
Residencia Reception (day time) (0) +34 922 405 500 (ORM internal: 2500)
Residencia Night Porter (night time) (0) +34 609 554 576
Commissioning Leader (0) +34 676 649 025
Telescope Manager: Patricia Márquez (0) +34 620 413 156
LST Commissioning Container (0) +34 922 405 556 (ORM internal: 2556)
MAGIC Control Room (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2-678, 2-679)

Alarms

Alarms are sent to lst1.c.leader@gmail.com which is on the shift leader phone.

Overall Commissioning Plans 2019

The overall commissioning plan can be found in: LST Commissioning Schedule

Check-lists

Monitoring

Useful links

Sub-system Contacts

Camera Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es)
Drive / Telescope Control Julia Mundet (jmundet@ifae.es), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr)
Optics Koji Noda (knoda@mppmu.mpg.de)
Auxiliary Systems Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr)
IT Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp, Rafael - Fujitsu (rafael@jp.fujitsu.com, IT admins (admin-ctan@cta-observatory.org)

Useful Info

Screens in Commissioning Container & Onsite IT
ScreenArrangement-v3 test.png Onsite-IT.png

Tasks

  • Report in the EB meeting, Tuesdays 09:30 CET
  • Coordinate activities on-site
  • Check for the overall safety in the telescope area