= Installation instructions =
 
= Installation instructions =
 
* [https://docs.google.com/document/d/1Vw9FJblxme8rYyBE5gS0NVFdd_6zbcdH9g99yGJAsGk/edit GPS installation instructions]
 
* [https://docs.google.com/document/d/1Vw9FJblxme8rYyBE5gS0NVFdd_6zbcdH9g99yGJAsGk/edit GPS installation instructions]
 +
* [https://docs.google.com/document/d/1htVpnw5ibd_UTQ-roBcHRS0OcN4Q9rj4qJQXG0HhVDk/edit LST1 Clock configuration]
 
* [http://www.lst1.iac.es/wiki/index.php/NVIDIA_card_installation NVIDIA PCI card installation]
 
* [http://www.lst1.iac.es/wiki/index.php/NVIDIA_card_installation NVIDIA PCI card installation]
 
* [http://www.lst1.iac.es/wiki/images/e/eb/EarthAndNeutral.pdf Slides of Taka on Earth Connections]
 
* [http://www.lst1.iac.es/wiki/images/e/eb/EarthAndNeutral.pdf Slides of Taka on Earth Connections]

Revision as of 12:37, 5 April 2019

Instructions and useful links for the LST Commissioning Leaders.

Emergency phone numbers

Public Emergency (0) 112
Residencia Reception (day time) (0) +34 922 405 500 (ORM internal: 2500)
Residencia Night Porter (night time) (0) +34 609 554 576
Commissioning Leader (0) +34 676 649 025
Telescope Manager: Patricia Márquez (0) +34 620 413 156
LST Commissioning Container (0) +34 922 405 556 (ORM internal: 2556)
MAGIC Control Room (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2678, 2679)
MAGIC Shiftleader (0) +34 629 160 816

Alarms

Alarms are sent to lst1.c.leader@gmail.com which is installed on the shift leader phone

Commissioning Plans 2019

The overall commissioning plan can be found in: LST Commissioning Schedule

Tasks

  • Report in the EB meeting, Tuesdays 09:30 CET
  • Coordinate activities on-site
  • Check for the overall safety in the telescope area
  • Make sure the camera check-lists are followed when operating the camera
  • Check the incidents page and make sure it is kept up to date
  • Report incidents to the commissioning whatsapp group
  • Report plans & important issues in the general elog: GENERAL

Check-lists

Monitoring

Publicly available monitoring:

Local monitoring running on mon-right monitors of the commissioning container:

Documentation

Data-taking procedures

Safety settings

Safe operation settings

Item

Threshold

Action if not fulfilled

Humidity inside the camera < 90% Move camera to Safe
Temperature inside the camera < 26 deg Move camera to Safe
Camera fans speed 2000-3000 Move camera to Safe
Alarms in OPCUA All green Move camera to Safe
Rain Park telescope. After close camera shutter
Wind speed < 50 km/h Park telescope. After close camera shutter
Wind gusts < 60 km/h Park telescope. After close camera shutter

Commissioning responsible

Coordinator Daniel Mazin (mazin@icrr.u-tokyo.ac.jp)
Deputy Coordinator Thomas Schweizer (tschweiz@mppmu.mpg.de)

Sub-system contacts

Camera Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es)
Drive Inocencio Monteiro (monteiro@lapp.in2p3.fr), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr)
Optics Koji Noda (knoda@icrr.u-tokyo.ac.jp)
Auxiliary Systems Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr)
Energy Storage Koji Noda (knoda@icrr.u-tokyo.ac.jp), Daniel Mazin (mazin@icrr.u-tokyo.ac.jp)
onsite IT centre Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp), Rafael - Fujitsu (rafael@jp.fujitsu.com), IT admins (admin-ctan@cta-observatory.org)

Phone contact list

Screen layout of the commissioning container

Screens in Commissioning Container
ScreenArrangement-v3 test.png
Layout March 2019
CommContainer Screens Top Left.jpg CommContainer Screens Top Right.jpg

Onsite computing

Onsite IT
Onsite-IT.png

Installation instructions