Instructions and useful links for the LST Commissioning Leaders and Commissioning Shifters. | Instructions and useful links for the LST Commissioning Leaders and Commissioning Shifters. | ||
− | = Emergency | + | == Emergency Phone Numbers == |
− | To dial any external number from the Commissioning Container you need to dial (0) first. From a cell phone do not dial the (0). | + | If possible save these numbers on your private phone before traveling to La Palma. To dial any external number from the Commissioning Container you need to dial (0) first. From a cell phone do not dial the (0). |
{| class="wikitable" | {| class="wikitable" | ||
Line 32: | Line 32: | ||
|} | |} | ||
− | |||
− | + | == ORM Booking == | |
+ | |||
+ | During your shift you must book a room at the ORM Residencia. Fill the [http://www.iac.es/formularioORM_res.php form here]. Where it asks you for the telescope pick "LST". Unless your institute has an account at the ORM you need to select to pay privately, also use this option if you are not sure. The form of payment can be changed on site. You might want to put in the comments you want a room in the annex apartments which are a bit cheaper, see the [http://www.iac.es/adjuntos/orm/TARIFAS2018.pdf current rates]. If you say nothing, they put you in the main building. | ||
+ | |||
+ | You can book your meals in the cafeteria through [http://www.iac.es/formularioORM_com.php?lang=en this form]. | ||
+ | |||
− | = Commissioning Plans and Shift Schedule 2019 = | + | == Commissioning Plans and Shift Schedule 2019 == |
The overall commissioning plan can be found in the first sheet of the [https://docs.google.com/spreadsheets/d/19Iw7Y3T56AhzhMG7B_foj61pFzf-Ecf9p-YTB4ManMI LST Commissioning Schedule], the shift plan on the second sheet. | The overall commissioning plan can be found in the first sheet of the [https://docs.google.com/spreadsheets/d/19Iw7Y3T56AhzhMG7B_foj61pFzf-Ecf9p-YTB4ManMI LST Commissioning Schedule], the shift plan on the second sheet. | ||
− | = Tasks = | + | == Commissioning Leader Tasks == |
− | * Report in the EB meeting, Tuesdays | + | * Report in the EB meeting, Tuesdays 9:30 CET (8:30 La Palma time) |
* Coordinate activities on-site | * Coordinate activities on-site | ||
* Check for the overall safety in the telescope area | * Check for the overall safety in the telescope area | ||
Line 48: | Line 52: | ||
* Check the incidents page and make sure it is kept up to date | * Check the incidents page and make sure it is kept up to date | ||
* Report incidents to the commissioning whatsapp group | * Report incidents to the commissioning whatsapp group | ||
− | * Report plans & important issues in the | + | * Report plans & important issues in the [http://www.lst1.iac.es/elog/GENERAL/ GENERAL ELOG] |
+ | |||
+ | |||
+ | == Shift Information == | ||
+ | |||
+ | === Alarms === | ||
+ | |||
+ | Alarms are sent to lst1.c.leader@gmail.com which is installed on the shift leader phone. | ||
+ | |||
+ | === Camera Check-lists === | ||
− | |||
* [https://docs.google.com/forms/d/1TbEijz3uhTyQJTGK7m3GCKNs2kXykWMArb3KN7irFqE/viewform?edit_requested=true Camera Startup] | * [https://docs.google.com/forms/d/1TbEijz3uhTyQJTGK7m3GCKNs2kXykWMArb3KN7irFqE/viewform?edit_requested=true Camera Startup] | ||
* [https://docs.google.com/forms/d/1ZcsP5rCBJWYjUZg0TRU9YPVVjEaaPaLWc45uVJEnWYU/viewform?edit_requested=true Camera Shutdown] | * [https://docs.google.com/forms/d/1ZcsP5rCBJWYjUZg0TRU9YPVVjEaaPaLWc45uVJEnWYU/viewform?edit_requested=true Camera Shutdown] | ||
− | = Monitoring = | + | === Monitoring === |
+ | |||
Publicly available monitoring: | Publicly available monitoring: | ||
* [http://www.magic.iac.es/site/weather/index.html MAGIC Weather] | * [http://www.magic.iac.es/site/weather/index.html MAGIC Weather] | ||
Line 67: | Line 80: | ||
* Event display: [http://www.lst1.iac.es/wiki/index.php/Event_Display Instructions on Event Display] | * Event display: [http://www.lst1.iac.es/wiki/index.php/Event_Display Instructions on Event Display] | ||
− | = Documentation = | + | === Documentation === |
+ | |||
* [https://www.overleaf.com/4571234755dchgwppvxmxn LST1 Commissioning Operation Manual (overleaf)] | * [https://www.overleaf.com/4571234755dchgwppvxmxn LST1 Commissioning Operation Manual (overleaf)] | ||
* [https://docs.google.com/spreadsheets/d/1wi4CGx1Tmhloic1J_4FWs8m_PeB4wtHT6cpxU-ngVjI/edit#gid=0 Shifters 2019] | * [https://docs.google.com/spreadsheets/d/1wi4CGx1Tmhloic1J_4FWs8m_PeB4wtHT6cpxU-ngVjI/edit#gid=0 Shifters 2019] | ||
Line 77: | Line 91: | ||
* [https://docs.google.com/spreadsheets/d/1XQR_n-Il8oztzJ3mErjdx_aycwsRhlmcWVW4L8XcSps/edit?usp=sharing LST Shipments] | * [https://docs.google.com/spreadsheets/d/1XQR_n-Il8oztzJ3mErjdx_aycwsRhlmcWVW4L8XcSps/edit?usp=sharing LST Shipments] | ||
− | = Data-taking procedures = | + | === Data-taking procedures === |
+ | |||
* [https://portal.cta-observatory.org/WG/lst/DAQ/SitePages/Data_taking_procedure.aspx DAQ] | * [https://portal.cta-observatory.org/WG/lst/DAQ/SitePages/Data_taking_procedure.aspx DAQ] | ||
* [https://docs.google.com/document/d/1GVnyVsJhRl3ByrHBa2-u3f3p9k6figq7_eN4pENh6Dw/edit?ts=5c66ef24 CACO] | * [https://docs.google.com/document/d/1GVnyVsJhRl3ByrHBa2-u3f3p9k6figq7_eN4pENh6Dw/edit?ts=5c66ef24 CACO] | ||
− | = Safety settings = | + | === Safety settings === |
{| class="wikitable" | {| class="wikitable" | ||
Line 123: | Line 138: | ||
|} | |} | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
+ | === Screen Layout Commissioning Container === | ||
{| class="wikitable" | {| class="wikitable" | ||
Line 166: | Line 147: | ||
|- | |- | ||
|} | |} | ||
+ | |||
{| class="wikitable" | {| class="wikitable" | ||
|+ Layout March 2019 | |+ Layout March 2019 | ||
Line 173: | Line 155: | ||
|} | |} | ||
− | = | + | === On-site Computing === |
* [https://ctaoobservatory.sharepoint.com/:b:/s/ctan-onsite-it/Ec00wDApkVlBuI2cO4PVyCUBoxFX2AqtFYDVGGKw7_ys0A?e=eNghvu Log-in procedure to cp01/cp02 machines] | * [https://ctaoobservatory.sharepoint.com/:b:/s/ctan-onsite-it/Ec00wDApkVlBuI2cO4PVyCUBoxFX2AqtFYDVGGKw7_ys0A?e=eNghvu Log-in procedure to cp01/cp02 machines] | ||
Line 187: | Line 169: | ||
|} | |} | ||
− | = | + | |
− | + | == Contacts == | |
− | + | ||
− | + | === Commissioning responsible === | |
− | + | ||
+ | {| class="wikitable" | ||
+ | | Coordinator | ||
+ | | Daniel Mazin ([mailto:mazin@icrr.u-tokyo.ac.jp mazin@icrr.u-tokyo.ac.jp]) | ||
+ | |- | ||
+ | | Deputy Coordinator | ||
+ | | Thomas Schweizer ([mailto:tschweiz@mppmu.mpg.de tschweiz@mppmu.mpg.de]) | ||
+ | |- | ||
+ | | Safety & Operations Coordinator | ||
+ | | Martin Will ([mailto:mwill@mppmu.mpg.de mwill@mppmu.mpg.de]) | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | === Sub-system contacts === | ||
+ | |||
+ | {| class="wikitable" | ||
+ | | Camera | ||
+ | | Carlos Delgado ([mailto:carlos.delgado@ciemat.es carlos.delgado@ciemat.es]), Oscar Blanch ([mailto:blanch@ifae.es blanch@ifae.es]) | ||
+ | |- | ||
+ | | Drive | ||
+ | | Inocencio Monteiro ([mailto:monteiro@lapp.in2p3.fr monteiro@lapp.in2p3.fr]), Thierry Le Flour ([mailto:thierry.le-flour@lapp.in2p3.fr thierry.le-flour@lapp.in2p3.fr]) | ||
+ | |- | ||
+ | | Optics | ||
+ | | Koji Noda ([mailto:knoda@icrr.u-tokyo.ac.jp knoda@icrr.u-tokyo.ac.jp]) | ||
+ | |- | ||
+ | | Auxiliary Systems | ||
+ | | Armand Fiasson ([mailto:armand.fiasson@lapp.in2p3.fr armand.fiasson@lapp.in2p3.fr]), Eric Chabanne ([mailto:eric.chabanne@lapp.in2p3.fr eric.chabanne@lapp.in2p3.fr]) | ||
+ | |- | ||
+ | | Energy Storage | ||
+ | | Koji Noda ([mailto:knoda@icrr.u-tokyo.ac.jp knoda@icrr.u-tokyo.ac.jp]), Daniel Mazin ([mailto:mazin@icrr.u-tokyo.ac.jp mazin@icrr.u-tokyo.ac.jp]) | ||
+ | |- | ||
+ | | On-site IT Center | ||
+ | | Daniela Hadasch ([mailto:hadasch@icrr.u-tokyo.ac.jp hadasch@icrr.u-tokyo.ac.jp]), Rafael - Fujitsu ([mailto:rafael@jp.fujitsu.com rafael@jp.fujitsu.com]), IT admins ([mailto:admin-ctan@cta-observatory.org admin-ctan@cta-observatory.org]) | ||
+ | |- | ||
+ | |} |
Revision as of 15:15, 27 May 2019
Instructions and useful links for the LST Commissioning Leaders and Commissioning Shifters.
Contents
Emergency Phone Numbers
If possible save these numbers on your private phone before traveling to La Palma. To dial any external number from the Commissioning Container you need to dial (0) first. From a cell phone do not dial the (0).
Public Emergency | (0) 112 |
Residencia Reception (day time) | (0) +34 922 405 500 (ORM internal: 2500) |
Residencia Night Porter (night time) | (0) +34 609 554 576 |
LST Commissioning Leader | (0) +34 676 649 025 |
LST Telescope Manager: Patricia Márquez | (0) +34 620 413 156 |
LST Commissioning Container | (0) +34 922 405 556 (ORM internal: 2556) |
MAGIC Control Room | (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2678, 2679) |
MAGIC Shift Leader | (0) +34 629 160 816 |
ORM Booking
During your shift you must book a room at the ORM Residencia. Fill the form here. Where it asks you for the telescope pick "LST". Unless your institute has an account at the ORM you need to select to pay privately, also use this option if you are not sure. The form of payment can be changed on site. You might want to put in the comments you want a room in the annex apartments which are a bit cheaper, see the current rates. If you say nothing, they put you in the main building.
You can book your meals in the cafeteria through this form.
Commissioning Plans and Shift Schedule 2019
The overall commissioning plan can be found in the first sheet of the LST Commissioning Schedule, the shift plan on the second sheet.
Commissioning Leader Tasks
- Report in the EB meeting, Tuesdays 9:30 CET (8:30 La Palma time)
- Coordinate activities on-site
- Check for the overall safety in the telescope area
- Make sure the camera check-lists are followed when operating the camera
- Check the incidents page and make sure it is kept up to date
- Report incidents to the commissioning whatsapp group
- Report plans & important issues in the GENERAL ELOG
Shift Information
Alarms
Alarms are sent to lst1.c.leader@gmail.com which is installed on the shift leader phone.
Camera Check-lists
Monitoring
Publicly available monitoring:
- MAGIC Weather
- Camera: Temperature/Pressure
- Camera: modules
- Camera: pixels
Local monitoring running on mon-right monitors of the commissioning container:
- Drive: startDriveMonitoring.sh script
- Flywheel: https://10.1.200.1/webvisu/webvisu.htm
- IT: https://10.1.200.5/webvisu/webvisu.htm
- Event display: Instructions on Event Display
Documentation
- LST1 Commissioning Operation Manual (overleaf)
- Shifters 2019
- Incidents 2019
- elog
- Safety documents
- Operation and Maintenance Manuals
- CTA-North slack channel
- LST Shipments
Data-taking procedures
Safety settings
Item |
Threshold |
Action if not fulfilled |
Humidity inside the camera | < 90% | Move camera to Safe |
Temperature inside the camera | < 26 deg | Move camera to Safe |
Camera fans speed | 2000-3000 | Move camera to Safe |
Alarms in OPCUA | All green | Move camera to Safe |
Rain | Park telescope. After close camera shutter | |
Wind speed | < 50 km/h | Park telescope. After close camera shutter |
Wind gusts | < 60 km/h | Park telescope. After close camera shutter |
Screen Layout Commissioning Container
On-site Computing
- Log-in procedure to cp01/cp02 machines
- Network organization: IP ranges
- CTA North Array Control System (IP, Switch port, Server port, cables)
- Slides from Jordi on the IT cluster, Nov. 2018
Contacts
Commissioning responsible
Coordinator | Daniel Mazin (mazin@icrr.u-tokyo.ac.jp) |
Deputy Coordinator | Thomas Schweizer (tschweiz@mppmu.mpg.de) |
Safety & Operations Coordinator | Martin Will (mwill@mppmu.mpg.de) |
Sub-system contacts
Camera | Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es) |
Drive | Inocencio Monteiro (monteiro@lapp.in2p3.fr), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr) |
Optics | Koji Noda (knoda@icrr.u-tokyo.ac.jp) |
Auxiliary Systems | Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr) |
Energy Storage | Koji Noda (knoda@icrr.u-tokyo.ac.jp), Daniel Mazin (mazin@icrr.u-tokyo.ac.jp) |
On-site IT Center | Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp), Rafael - Fujitsu (rafael@jp.fujitsu.com), IT admins (admin-ctan@cta-observatory.org) |