Difference between revisions of "Incidents 2021"
(Created page with "{| class="wikitable" border=1 cellpadding="5" cellspacing="0" |- style="background:#efefef;" ! style="width: 100px;" | Date !! style="width: 210px;" | What happened? !! style...") |
|||
Line 4: | Line 4: | ||
|- valign="top" | |- valign="top" | ||
− | | | + | | 2021-01-19 || Consequences of Snow storm in the ORM (january 2021): 1.Cover of motors of ALS´s are damaged; 2. Handrail of camera access tower is damaged; 3. A network cabinet is damaged; 4.A cable of ALS-West was removed; 5.Cover of cable trays were removed || Inspection and repair || An inspection has been done by LST team on 18.01.2021. Several tests were done. A final inspection is pending because there are a lot of ice in the site. 1. Pending / 2. Pending / 3. Pending / 4. Repaired / 5. Pending || [[File:IMG_20210118_111533.jpg|120px|thumb|left|]][[File:IMG_20210115_113018.jpg|120px|thumb|right|]] [[File:IMG_20210118_112318.jpg|thumb|rigth|.]] || NO |
Revision as of 15:37, 19 January 2021
Date | What happened? | Corrective measures | Comments | Documents | Incident Closed? |
---|---|---|---|---|---|
2021-01-19 | Consequences of Snow storm in the ORM (january 2021): 1.Cover of motors of ALS´s are damaged; 2. Handrail of camera access tower is damaged; 3. A network cabinet is damaged; 4.A cable of ALS-West was removed; 5.Cover of cable trays were removed | Inspection and repair | An inspection has been done by LST team on 18.01.2021. Several tests were done. A final inspection is pending because there are a lot of ice in the site. 1. Pending / 2. Pending / 3. Pending / 4. Repaired / 5. Pending | NO |