Commissioning Shift P1

From my_wiki
Revision as of 11:55, 29 January 2019 by MartinWill (talk | contribs) (Created page with "* Commissioning Shift Period: 1 * Dates: 19.1.2019 - 4.2.2019 * Commissioning Shift Leader: Riccardo Rando * Commissioning Shifters: ** Drive: XXX (Dates), XXX (Dates), ... **...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Commissioning Shift Period: 1
  • Dates: 19.1.2019 - 4.2.2019
  • Commissioning Shift Leader: Riccardo Rando
  • Commissioning Shifters:
    • Drive: XXX (Dates), XXX (Dates), ...
    • AMC: ...
    • ...

Commissioning Leader Diary

Commissioning_Leader_Diary_P1

Daily List of Tests and Installations

Date Category / System Action Comments Documents / Pictures
2019-01-20 CL Check of conditions at site P1 CL R. Rando arrived on site, no overlap with previous CL (since there was none).
2019-01-21 CL Day off No activities on site.
2019-01-22 Drive
2019-01-22 Camera
2019-01-22 AMC