Commissioning Shift Information
Instructions and useful links for the LST Commissioning Leaders.
Contents
- 1 Emergency phone numbers
- 2 Alarms
- 3 Commissioning Plans 2019
- 4 Tasks
- 5 Check-lists
- 6 Monitoring
- 7 Documentation
- 8 Data-taking procedures
- 9 Safety settings
- 10 Commissioning responsible
- 11 Sub-system contacts
- 12 Screen layout of the commissioning container
- 13 Onsite computing
- 14 Installation instructions
Emergency phone numbers
Public Emergency | (0) 112 |
Residencia Reception (day time) | (0) +34 922 405 500 (ORM internal: 2500) |
Residencia Night Porter (night time) | (0) +34 609 554 576 |
Commissioning Leader | (0) +34 676 649 025 |
Telescope Manager: Patricia Márquez | (0) +34 620 413 156 |
LST Commissioning Container | (0) +34 922 405 556 (ORM internal: 2556) |
MAGIC Control Room | (0) +34 922 405 678, (0) +34 922 405 679 (ORM internal: 2678, 2679) |
MAGIC Shiftleader | (0) +34 629 160 816 |
Alarms
Alarms are sent to lst1.c.leader@gmail.com which is installed on the shift leader phone
Commissioning Plans 2019
The overall commissioning plan can be found in: LST Commissioning Schedule
Tasks
- Report in the EB meeting, Tuesdays 09:30 CET
- Coordinate activities on-site
- Check for the overall safety in the telescope area
- Make sure the camera check-lists are followed when operating the camera
- Check the incidents page and make sure it is kept up to date
- Report incidents to the commissioning whatsapp group
- Report plans & important issues in the general elog: GENERAL
Check-lists
Monitoring
Publicly available monitoring:
- MAGIC Weather
- Camera: Temperature/Pressure
- Camera: modules
- Camera: pixels
Local monitoring running on mon-right monitors of the commissioning container:
- Drive: startDriveMonitoring.sh script
- Flywheel: https://10.1.200.1/webvisu/webvisu.htm
- IT: https://10.1.200.5/webvisu/webvisu.htm
Documentation
- LST1 Commissioning Operation Manual (overleaf)
- Shifters 2019
- Incidents 2019
- elog
- Safety documents
- Operation and Maintenance Manuals
- CTA-North slack channel
- LST Shipments
Data-taking procedures
Safety settings
Item |
Threshold |
Action if not fulfilled |
Humidity inside the camera | < 90% | Move camera to Safe |
Temperature inside the camera | < 26 deg | Move camera to Safe |
Camera fans speed | 2000-3000 | Move camera to Safe |
Alarms in OPCUA | All green | Move camera to Safe |
Rain | Park telescope | |
Wind speed | < XX km/h | Park telescope |
Wind gusts | < XX km/h | Park telescope |
Commissioning responsible
Coordinator | Daniel Mazin (mazin@icrr.u-tokyo.ac.jp) |
Deputy Coordinator | Thomas Schweizer (tschweiz@mppmu.mpg.de) |
Sub-system contacts
Camera | Carlos Delgado (carlos.delgado@ciemat.es), Oscar Blanch (blanch@ifae.es) |
Drive | Inocencio Monteiro (monteiro@lapp.in2p3.fr), Thierry Le Flour (thierry.le-flour@lapp.in2p3.fr) |
Optics | Koji Noda (knoda@icrr.u-tokyo.ac.jp) |
Auxiliary Systems | Armand Fiasson (armand.fiasson@lapp.in2p3.fr), Eric Chabanne (eric.chabanne@lapp.in2p3.fr) |
Energy Storage | Koji Noda (knoda@icrr.u-tokyo.ac.jp), Daniel Mazin (mazin@icrr.u-tokyo.ac.jp) |
onsite IT centre | Daniela Hadasch (hadasch@icrr.u-tokyo.ac.jp), Rafael - Fujitsu (rafael@jp.fujitsu.com), IT admins (admin-ctan@cta-observatory.org) |
Screen layout of the commissioning container
Onsite computing
- Log-in procedure to cp01/cp02 machines
- Network organization: IP ranges
- CTA North Array Control System (IP, Switch port, Server port, cables)
- Slides from Jordi on the IT cluster, Nov. 2018