Commissioning Shift P1

From my_wiki
Revision as of 14:50, 29 January 2019 by Ricrando (talk | contribs)
Jump to: navigation, search
  • Commissioning Shift Period: 1
  • Dates: 19.1.2019 - 4.2.2019
  • Commissioning Shift Leader: Riccardo Rando
  • Commissioning Shifters:
    • Drive: Armand, Inocencio, Thierry (22/01-25/01), Alessandro (27/01-)
    • Camera: Elena (-), Mitsunari (21/01-), Taka (27/01-)
    • Aux: Koji (28/01-)

Back to Commissioning Logbooks.

Commissioning Leader Diary

Commissioning_Leader_Diary_P1

Daily List of Tests and Installations

Date Category / System Action Comments Documents / Pictures
2019-01-20 Other Check of conditions at site P1 CL R. Rando arrived on site, no overlap with previous CL (since there was none).
2019-01-21 Drive
Monday Camera Some tests with FSM state
AUX
Other
2019-01-22 Drive Tests mission "Park In/Park" Out with all software chain. (Bug in December). Tests mission "Park In/Park Out" with cancel and restart at various intermediate position. Measurement of the elevation motor torque vs clamping vs arch cable tension
Tuesday Camera
AUX
Other Road condition critical
2019-01-23 Drive
Wednesday Camera
AUX
Other
2019-01-24 Drive
Thursday Camera
AUX
Other
2019-01-25 Drive
Friday Camera
AUX
Other
2019-01-26 Drive
Saturday Camera
AUX
Other
2019-01-27 Drive
Sunday Camera
AUX
Other