Wed Mar 6 14:58:51 2019, Drive Team- Ino&Thierry&Armand, Telescope Operations, General, Access tower failure,
|
During a park-in action , the acces tower did not close correctly. |
Wed Mar 6 10:54:33 2019, Drive Team- Ino&Thierry&Armand, Telescope Operations, General, DRIVE : High Speed tests,
|
- The FW issue is not solved . No movement can be done
- The FW is going to be restarted ==> It takes several hours to put it down and up again
- Drive movement are stucked
|
Tue Mar 5 14:42:22 2019, Drive Team- Ino&Thierry, Telescope Operations, General, High speed drive tests,
|
. Fisrt day of the high speed drive tests with IFAE team.
- Tests for tuning and generating motor plots at 10% (0.0234 Rad/s) of the maximal speed (GRB alert speed)
- Tuning of the emergency stop from 0.05 Rad/s2 up to 0.2 Rad/s2
- 6 movements at 25% speed. (from -90 to 270)
- repositionnning to -90 at 40%
- movements from -90 to 270 and reverse at 40%
- 3 movements from -90 to 270 and reverse at 60% : the FW generates an alarm and the drive stops the movement.
- The FW level was ok but the the status (GRB Fast Rotation and UPS system) got red.
- Koji has been contacted to look at this issue.
|
Thu Feb 28 20:01:44 2019, Drive Team- Ino&Thierry, Telescope Operations, General, Polaris point for mirrors aligment,
|
Same operations as yesterday ==> Polaris position |
Thu Feb 28 19:56:55 2019, Drive Team- Ino&Thierry, PLC Software and Configuration, , Tracking debug and setup,
|
Debugging of the tracking sequence :
- PLC sequence : trajectory tracking data correctly managed
- PLC tuning : regulation OK ==> need to refine.
- Tracking algorithm :
- Changes in Drive.ccp to allow azimuth negative values.
- Tracking duration : even by changing the duration of he tracking (from 1'to 5') ==> not correctly managed (still 1' tracking) ==> to be checked
-
|
Wed Feb 27 20:33:17 2019, Drive Team- Ino&Thierry, Telescope Operations, General, Polaris point for mirrors aligment,
|
Same operations as yesterday ==> pointing to Polaris with the same coordinates |
Tue Feb 26 20:47:15 2019, Drive Team- Ino&Thierry, Telescope Operations, General, Polaris point for mirrors aligment,
|
Pointing to polaris ==>
Azimuth = 0.808
Elevation = 59.941 + 1 degree (correction) |
Tue Feb 26 20:45:41 2019, Drive Team- Ino&Thierry, Telescope Operations, General, Tracking debug,
|
Start of the tracking debug ==> PLC and MOS |
Wed Jan 30 15:43:12 2019, Drive Team, Telescope Operations, Software, Tests Tracking,
|
Tests and debugging of the tracking procedure. Many components are involved : PLC MOS GUIs.
Each component needs to be well debbuged to achieve a safe movement of the telescope
==> IN PROGRESS
|
Mon Jan 28 15:27:35 2019, Drive Team, Telescope Operations, Software, Error Tests ,
|
- Debugging of the "Parkout" sequence with errors ==>
- MOS received the error and set the FSM in error state
- User from semi-expert GUI should acknowledge the error ==> MOS FSM acknowledge methosd is call (just authorized from the error state) to acknowledge the error to the PLC.
- PLC set up all the needed variables to inform the MOS and GUI of the result of the acknowlegment
- Today, an PLC error sends the MOS FSM in the ERROR state which can the only go "Parked" state via the "Acknowlegde" method.
|
Sat Jan 26 09:49:34 2019, Drive Team, Telescope Operations, General, Goto Position tests,
|
Many differents succesfull "goto position" operations ... MOS configuration file (XML) modified to aplly to correct Azimth and Elevation ranges for secure movement
- GotoPosition azimuth range : [-126..354]
- GotoPosition elevation range : [0..75]
- FastGotoPosition azimuth range : [-96..324]
- FastGotoPosition elevation range : [0..50]
|
Fri Jan 25 14:12:28 2019, Drive Team, Telescope Operations, General, Drive Movement : PArkin and Parkout,
|
Many parkin operations done. To confirm the different movements , a Parkin test with a azimuth position 20 and Elevation 70.
This is to validate the complete "Parkin" scenario with "random" az and el positions |
Fri Jan 25 12:39:52 2019, Drive Team, Problem Fixed, Hardware, Brakes issues fixed,
|
The brake of the elevation issue has been fixed. Operations on drive can be resumed. |
Thu Jan 24 10:52:59 2019, Drive Team, Hardware, Issues, ,
|
After issues during the parkin procedures ( 100% elveation torque ) :
- a visual inpsection has been done : access is not involved , 2 possible causes :
- rolls on elevation structure because they are rolling (4 of them yes , 4 of them not)
- motor break ==> under investigation
|
Wed Jan 23 15:10:34 2019, Drive Team, Telescope Operations, Hardware, ,
|
Emergency stop applied because of a azimuth value(encoder) not in the pre-defined range +-0.015
- first parkin ==> Azimuth 0.013 ==> Emergency because offset even if in the correct range
- 2nd parkin ==> Azimuth 0.004 ==> Emenrgency stop because offset not in the correct range (eye control not drive control)
|
Wed Jan 23 11:26:29 2019, Drive Team, PLC Software and Configuration, General, Azimuth tuning ,
|
- To define precisely the correction to apply to Azimuth positionning, a set of movements have been done to calculte the correction coefficient.
- A scan from 0 deg. to 270 deg. with a step of 10 deg. and a reverse scan from 270 deg. to 0 deg. with a step of 50.deg realized to have a better approximation
|
Tue Jan 22 15:55:25 2019, Drive Team, Software Installation, Software, TESTS Parkout Parkin,
|
- Many parkin and parkout operations with different torque (with the clamping system of the access tower (from 18% to 8% = 26N/m). With 8%, the locking position cannot be reached
- Some minors have been corrected
|
Tue Jan 22 09:37:03 2019, Ino Monteiro, PLC Software and Configuration, Software, Installation new PLC version,
|
Installation of the new PLC code and re-initilalisation of the system. |
Fri Jan 18 10:14:51 2019, Thierry Le Flour, Software Installation, General, Initlisation of the DRIVE logbook,
|
Here is the first entry in the DRIVE ELOG logbook |