Difference between revisions of "Main Page"
m (Add link to MoU.) |
m (Add item.) |
||
Line 91: | Line 91: | ||
* '''[[Downloading MAGIC+LST-1 data]]''' | * '''[[Downloading MAGIC+LST-1 data]]''' | ||
* '''[[MAGIC priority proposals for joint observations]]''' | * '''[[MAGIC priority proposals for joint observations]]''' | ||
+ | * '''[[Rules for joint analyses results approval]]''' | ||
== System Engineering == | == System Engineering == |
Revision as of 18:23, 5 April 2024
Welcome to the LST-1 Wiki!
Contents
- 1 Commissioning Schedule
- 2 Commissioning Shift Information
- 3 LST-1 Logbooks
- 4 Incidents
- 5 LST-1 Observing Cycles
- 6 LST-1 Physics Working Groups
- 7 LST-1 Technical Papers
- 8 LST-1 data analysis
- 9 MAGIC+LST-1 joint data analysis
- 10 System Engineering
- 11 Getting Started
- 12 Navigation
- 13 Remote Control Room Photos
- 14 LST1 images (for conferences, outreach, etc)
Commissioning Schedule
LST1 commissioning schedules can be found here: 2024 2023 2022 2021 2020 2019
Commissioning Shift Information
Instructions and useful information for Commissioning Leaders and Shifters.
LST-1 Logbooks
Telescope Commissioning
Logistics
On-Site Installations
- Logbook of the foundation construction
- Logbook of the rail and central pin installation
- Logbook of the bogies and azimuth knots installation
- Logbook of the Drive Tests Sep 2017
- Logbook of the Mirror Installation Apr / May 2018
- Logbook of the Provisional ALS installation and Pinion adjustment July 2018
- Logbook of the AMC box installation, AMC cabling and last mirrors installation 2018
- Logbook of the Camera Commissioning at ORM, October 2018
- Logbook of the Drive Tests, October 2018
- Logbook of the AMC Commissioning at ORM, Nov/Dec 2018
Off-Site Tests
- Logbook of the assembly of modules at IAC
- Logbook of the tests and calibrations at IAC in August - September 2017
- Logbook of the mirror tests at Mirca in Aug / Sep 2017
- Logbook of the mirror tests at Mirca in Nov / Dec 2017
- Logbook of Interface plate assembly at Mirca in Jan / Feb 2018
- Logbook of optics setup at Mirca in Apr / May 2018
- Logbook of the assembly of the camera at IFAE
- Logbook of the preparation of AMC boxes and AMC cables at Mirca in July 2018
- Logbook of the camera preparation at Mirca in Aug - Sept 2018
DAQ runbook, etc.
LST1 camera hardware change log
Incidents
LST-1 Observing Cycles
LST-1 Physics Working Groups
LST-1 Technical Papers
LST-1 data analysis
- MC productions
- MC analysis and IRF production
- Downloading data
- Data analysis
- Commissioning
- Transient observation logbook
- Working at the LST-IT center
- LST Data Access and Publication Policy
- Memoranda of Understanding
- R0G and R0V production
MAGIC+LST-1 joint data analysis
For the MoU between LST and MAGIC, see MoU MAGIC LST.
- Joint data table
- Downloading MAGIC+LST-1 data
- MAGIC priority proposals for joint observations
- Rules for joint analyses results approval
System Engineering
Getting Started
Want to contribute to this wiki? Sign up in one minute and start in two! It's easier than HTML! To learn few things and rules to start editing wikipages visit the help page.
- Configuration settings list
- MediaWiki FAQ
- MediaWiki release mailing list
- Localise MediaWiki for your language