Main Logbooks page
LST commissioning
Shift checklists
Safe state checklists
Maintenance activities
LST2-4 Commissioning
Old logbooks
GENERAL
CAMERA
DRIVE
ENERGY
AMC
LST1 Drive ELOG, Page 3 of 3
Find
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Software Installation
Problem Fixed
Hardware
PLC Software and Configuration
Telescope Operations
Applications
Other
PLC + Control Software debugging
Tracking Debugging
-- Status --
Fixed
Under Process
Not Fixed
60 Entries
Goto page
Previous
1
,
2
, 3
All
ID
Date
Author
Type
Category
Subject
Status
Text
239
Wed Mar 6 15:33:14 2019
Drive Team- Ino&Thierry&Armand
Telescope Operations
General
Test High Speed Drive
Test at 60% maximal speed from
-90 to 0
Check of the
FW discharge : No error (FW 2 : 95% FW1 :
238
Wed Mar 6 14:58:51 2019
Drive Team- Ino&Thierry&Armand
Telescope Operations
General
Access tower failure
During a park-in action , the acces tower
did not close correctly.
237
Wed Mar 6 10:54:33 2019
Drive Team- Ino&Thierry&Armand
Telescope Operations
General
DRIVE : High Speed tests
The FW issue is not solved . No
movement can be done
The FW is
going to be restarted ==> It takes several
236
Tue Mar 5 14:42:22 2019
Drive Team- Ino&Thierry
Telescope Operations
General
High speed drive tests
. Fisrt day of the high speed drive tests
with IFAE team.
Tests for tuning and generating
235
Thu Feb 28 20:01:44 2019
Drive Team- Ino&Thierry
Telescope Operations
General
Polaris point for mirrors aligment
Same operations as yesterday ==> Polaris
position
234
Thu Feb 28 19:56:55 2019
Drive Team- Ino&Thierry
PLC Software and Configuration
Tracking debug and setup
Debugging of the tracking sequence :
PLC sequence : trajectory
tracking data correctly managed
PLC
233
Wed Feb 27 20:33:17 2019
Drive Team- Ino&Thierry
Telescope Operations
General
Polaris point for mirrors aligment
Same operations as yesterday ==> pointing
to Polaris with the same coordinates
232
Tue Feb 26 20:47:15 2019
Drive Team- Ino&Thierry
Telescope Operations
General
Polaris point for mirrors aligment
Pointing to polaris ==>
Azimuth = 0.808
Elevation = 59.941 + 1 degree (correction)
231
Tue Feb 26 20:45:41 2019
Drive Team- Ino&Thierry
Telescope Operations
General
Tracking debug
Start of the tracking debug ==> PLC
and MOS
230
Wed Jan 30 15:43:12 2019
Drive Team
Telescope Operations
Software
Tests Tracking
Tests and debugging of the tracking procedure.
Many components are involved : PLC MOS GUIs.
Each component needs to be well
229
Mon Jan 28 15:27:35 2019
Drive Team
Telescope Operations
Software
Error Tests
Debugging of the "Parkout"
sequence with errors ==>
MOS
received the error and set the FSM in error
228
Sat Jan 26 09:49:34 2019
Drive Team
Telescope Operations
General
Goto Position tests
Many differents succesfull "goto
position" operations ... MOS configuration
file (XML) modified to aplly to correct Azimth
227
Fri Jan 25 14:12:28 2019
Drive Team
Telescope Operations
General
Drive Movement : PArkin and Parkout
Many parkin operations done. To confirm
the different movements , a Parkin test with
a azimuth position 20 and Elevation 70.
226
Fri Jan 25 12:39:52 2019
Drive Team
Problem Fixed
Hardware
Brakes issues fixed
The brake of the elevation issue has been
fixed. Operations on drive can be resumed.
225
Thu Jan 24 10:52:59 2019
Drive Team
Hardware
Issues
After issues during the parkin procedures
( 100% elveation torque ) :
a visual inpsection has
224
Wed Jan 23 15:10:34 2019
Drive Team
Telescope Operations
Hardware
Emergency stop applied because of a azimuth
value(encoder) not in the pre-defined range
+-0.015
223
Wed Jan 23 11:26:29 2019
Drive Team
PLC Software and Configuration
General
Azimuth tuning
To define precisely the correction
to apply to Azimuth positionning, a set of movements
have been done to calculte the correction
3
Tue Jan 22 15:55:25 2019
Drive Team
Software Installation
Software
TESTS Parkout Parkin
Many parkin and parkout operations
with different torque (with the clamping
system of the access tower (from 18% to 8%
2
Tue Jan 22 09:37:03 2019
Ino Monteiro
PLC Software and Configuration
Software
Installation new PLC version
Installation of the new PLC code and re-initilalisation
of the system.
1
Fri Jan 18 10:14:51 2019
Thierry Le Flour
Software Installation
General
Initlisation of the DRIVE logbook
Here is the first entry in the DRIVE ELOG
logbook
Goto page
Previous
1
,
2
, 3
All
ELOG V3.1.5-fc6679b