  238   Wed Mar 6 14:58:51 2019 Drive Team- Ino&Thierry&ArmandTelescope OperationsGeneralAccess tower failure 

During a park-in action , the acces tower did not close correctly.

  239   Wed Mar 6 15:33:14 2019 Drive Team- Ino&Thierry&ArmandTelescope OperationsGeneralTest High Speed Drive 
  • Test at 60% maximal speed from -90 to 0
    •  Check of the FW discharge : No error (FW 2 : 95% FW1 : 100%)
  • Test at 60% maximal speed from -90 to 270
    • Check of the FW discharge ==> Error (FW 2 : 90 % FW1 : 100%)
    • Drive stops at 250 degree.
    • Power consumption = 60kw
  •  
  240   Wed Mar 6 16:30:56 2019 Drive Team- Ino&Thierry&ArmandPLC + Control Software debuggingSoftwareTracking mode debug 
  • Debugging of the MOS plugin corresponding to the tracking 
  241   Fri Mar 8 09:20:29 2019 Drive Team- Ino&Thierry&ArmandTelescope OperationsGeneralHigh speed drive tests 
  • On Thrusday :
    • new movements at 45% from -90 to 270 have been done.
    • No possible movement at 60% because the FW and UPS issues are not solved yet
      • Ino will back on site when HITACHI team will be on site for FW maintenance
        • Tests at 60% will be done to validate (or not) the correction applied by Hitachi team.
  242   Fri Mar 8 09:25:22 2019 Drive Team- Ino&Thierry&ArmandPLC + Control Software debuggingSoftwareTracking debug and setup 
  • Tracking procedure has been debugged from the GUI-MOS (OPCUA Server with tracking plugin)-PLC
  • Still some improvments to apply but globally the procedure is running well.
  244   Mon Apr 1 07:36:04 2019 Drive Team- Ino&Thierry&ArmandTelescope OperationsGeneralTracking debug and setup 
  • Regulation of the motors (PID) for slow and fast tracking and motor oscillations.
  • Implementation and Debugging of the Semi-Expert control software for the drive.
    • GUIs + MOS plugin (OPCUA Server)
  •  Results are quite encouraging in good wheather condiftions.
    • additionnal tests in different (wind) conditions are envisaged to validate completly the process
  245   Mon Apr 1 07:43:23 2019 Drive Team- Ino&Thierry&ArmandProblem FixedHardwareLST Parking control 
  • On Wenesday morning (27/03/19) :
    • With Holger and Robert (MPI) , many telescope "park in/park out" operations have been performed in order to refine the positionning in the acces tower and at the elevation locking bolt
      Holger and Robert applied many mechanical modifications on the acces tower to make the telescope park operations very smooth
      ==> Conclusive operations. 
  248   Wed Apr 17 21:26:13 2019 Drive Team- Ino&Thierry&Alessandro, SatoshiTelescope OperationsGeneralTracking for mirrors alignment 
  • Tracking at position :
    • RA = 101.288541 RA Offset = -0.6
    • DEC = -16.71343 DEC Offset = 0.7
  250   Thu Apr 18 21:07:20 2019 Drive Team- Ino&Thierry&AlessandroTelescope Operations TESTS Parkout Parkin for fixing the bolt issue 
  • Different ParkOut and Parkin done with different values for testing the torque limitation. 
    • By decreasing the torque and the position , the parkin failed because we are not in the CSS locking sensor (in locking position)
    • By setting back the original values, th parkin is ok but the bolt cannot be properly inserted.
  251   Thu Apr 18 21:21:25 2019 Drive Team- Ino&Thierry&AlessandroTelescope OperationsHardwareElevation limit switch issue 

The 2 swicthes are too far from the target at 56.48 elevation.  The sensor have been tuned in parkin position and the distance was correct (2mm) and at 56.48 is about 10mm. (impossible to tune correctly the sensor and the atrger has to be tuned)

  271   Mon Sep 16 08:59:41 2019 Drive Team- Ino&Thierry + Ievgen + Vitalii + Jean-LucPLC + Control Software debugging Test TCU<->Drive 

Thierry&Ino on site

Ievgen, Vitalli and Jean-Luc remotely.

TCU tests to perform the parkin-in and park-out procedure from the Drive.

Results :

  • Actions can be triggered from the TCU and correctly executed thru the ACS Drive Bridge-MOS-Drive PLC.
  • Monitoring information is not correctly pushed from the bridge to the TCU (positions , ...)
    • Investigation brings many options. For the time being, a simple change in the ACS xml description will fix the problem. Anyway, this solution is not satifactory and a new solution will be implement asap.

Plans : Monday September 16th (2pm localtime) : new TCU tests to validate the intermediate solution for park-in, park-out and probably for some others action like Tracking,  GotoCircularPosition, ...

  231   Tue Feb 26 20:45:41 2019 Drive Team- Ino&ThierryTelescope OperationsGeneralTracking debug 

Start of the tracking debug ==> PLC and MOS 

  232   Tue Feb 26 20:47:15 2019 Drive Team- Ino&ThierryTelescope OperationsGeneralPolaris point for mirrors aligment 

Pointing to polaris ==>

Azimuth = 0.808

Elevation = 59.941 + 1 degree (correction)

  233   Wed Feb 27 20:33:17 2019 Drive Team- Ino&ThierryTelescope OperationsGeneralPolaris point for mirrors aligment 

Same operations as yesterday ==> pointing to Polaris with the same coordinates

  234   Thu Feb 28 19:56:55 2019 Drive Team- Ino&ThierryPLC Software and Configuration Tracking debug and setup 

Debugging of the tracking sequence :

  • PLC sequence : trajectory tracking data correctly managed
  • PLC tuning : regulation OK ==> need to refine.
  • Tracking algorithm :
    • Changes in Drive.ccp to allow azimuth negative values.
    • Tracking duration : even by changing the duration of he tracking (from 1'to 5') ==> not correctly managed (still 1' tracking) ==> to be checked
  •  
  235   Thu Feb 28 20:01:44 2019 Drive Team- Ino&ThierryTelescope OperationsGeneralPolaris point for mirrors aligment 

Same operations as yesterday ==> Polaris position

  236   Tue Mar 5 14:42:22 2019 Drive Team- Ino&ThierryTelescope OperationsGeneralHigh speed drive tests 

. Fisrt day of the high speed drive tests with IFAE team.

  • Tests for tuning and generating motor plots at 10% (0.0234 Rad/s) of the maximal speed (GRB alert speed)
  • Tuning of the emergency stop from 0.05 Rad/s2 up to 0.2 Rad/s2
  • 6 movements at 25% speed. (from -90 to 270)
  • repositionnning to -90 at 40% 
  • movements from -90 to 270 and reverse at 40%
  • 3 movements from -90 to 270 and reverse at 60%  : the FW generates an alarm and the drive stops the movement.
    • The FW level was ok but the the status (GRB Fast Rotation and UPS system) got red.
    • Koji has been contacted to look at this issue.
  246   Tue Apr 16 10:10:55 2019 Drive Team- Ino&ThierryPLC Software and Configuration Elevation setup 
  • 1 degree has been added to the Elevation accordingly to the last measurement given by Olger
  270   Thu Sep 12 16:41:53 2019 Drive Team- Ino&ThierryPLC + Control Software debugging   

Tuesday September 110th :

  • Tests park-in and park-out to manage the different type of failures 
  • Tests failure during park-in phase with a telescope in a position different from the park-out position
  • Tests (from the Drive semi-expert GUI) to send the telecope to the parking area from any positions. Useful to close the camera shutter without parking-in the telescope.
  • Night : tracking tests for fixing the shifhting issues : Problems with the PSF camera  

Wenesday September 11th :

  • Night : Still tracking tests for fixing the shifhting issues. PSF camera OK. Many pictures taken. Small shifting not yet understood
  247   Tue Apr 16 14:34:22 2019 Drive Team- InoTelescope OperationsHardwareCabling the azimuth end switches 
  • Cabling the azimuth end switches.